The Permission and Building Control carries 2 published figures read from 2 sources' own pages, from 663 to 739 GBP, read 12 September 2026.

663 to 739 GBP Range of the published figures 2 published figures, not one market: read the rows
2 Published figures from 2 source pages, read 18 Oct 2026
2 of 10 Sources read that publish one 20% publish a figure at all
  1. Redbridge Council, building control fee schedule, 1 April 2026739 GBP
  2. Oxford City Council, building control fees663 GBP
Every published figure, highest first.
Table view
RowValue
Redbridge Council, building control fee schedule, 1 April 2026739 GBP
Oxford City Council, building control fees663 GBP

2 of the 10 named sources read in full publish a figure; 8 publish none, read 12 September 2026.

By authority

BreakdownMedianRangeSources
authorityOxford663GBP663 to 663GBP1
authorityRedbridge739GBP739 to 739GBP1

Every figure, with its source

One row per published figure: the figure as the source's own page publishes it, the page, and the day it was read. A figure that is not on a page we read is not on this one.

SourceFigureBreakdownRead
Redbridge Council, building control fee schedule, 1 April 2026739GBPRedbridge2026-09-12
Oxford City Council, building control fees663GBPOxford2026-09-12
The sentence each figure was read from (2)

Read in full, publishes no figure

8 named sources were read in full on the dates shown and print no usable figure. They are counted, never filled in.

Methodology

Every row is a verbatim sentence read from the named source's own page through our fetch service on the date shown, hash-pinned to the stored read (the sha of the page's visible text; the raw page is mirrored to R2).

2 of the 10 named sources that could be read published a usable figure; 8 published none and are recorded as not published, never filled in; 1 could not be read (blocked, dead or unreachable) and count nowhere.

The headline figures (median, minimum, maximum, quartiles) are over ONE figure per source in GBP (a source's median where its page yielded several accepted sentences), so N counts sources, never sentences; 34 candidate sentence(s) were refused by a reviewer with the reason recorded.

The fuller derivation this dataset is chartered to grow into (not yet what the figures above are; they are each source's own published figure as read): one row per nation for the permission rule, quoted from the Order and the Regulations with the class named, beside a row per LOCAL AUTHORITY for the building control fee for a garage conversion, read from each council's own published fee schedule - the two councils read here charge £739 and £720 for the same job, and no one publishes that spread across all 300-odd authorities, which is the dataset.

34 candidate sentences on these pages were refused by a reviewer; each refusal and its reason is recorded in the review ledger.

Sources (11)
Cite or embed this figure

Cite or embed this figure

The Permission and Building Control carries 2 published figures read from 2 sources' own pages, from 663 to 739 GBP, read 12 September 2026.

2 of the 10 named sources read in full publish a figure; 8 publish none, read 12 September 2026.

Permission and Building Control, authority Oxford: median 663 GBP across 1 source, read 12 September 2026.

Permission and Building Control, authority Redbridge: median 739 GBP across 1 source, read 12 September 2026.

Cite as: "Roofing Quotes UK Permission and Building Control", updated 2026-10-18, https://roofingquotesuk.com/datasets/permission-and-building-control/.

Embed this figure (plain HTML, no scripts)

663 to 739 GBP

2 published figures, Permission and Building Control, across 2 sources, read 12 September 2026

Source: Roofing Quotes UK Permission and Building Control

Download the CSV (2 rows, computed 2026-10-18)

Get roofing quotesSearch the register