Double storey rear extension work, and what it really changes upstairs

A two storey extension is usually the best value per square metre a homeowner can buy, because one set of foundations and one roof serve two floors. It is also the one most likely to be refused, most likely to need a party wall award, and most likely to run into a problem that has nothing to do with the new rooms: how you get to them.

Get roofing quotes

Why a two storey house extension is good value: the second storey

The expensive parts of an extension are the groundworks, the roof and the professional fees. A second storey shares all three, so the additional floor area normally costs less per square metre than the first. That is why a two storey addition frequently makes financial sense where a large single storey one does not, and why it is the shape to test first on a plot that allows it.

Getting to the new rooms

New bedrooms need a landing, a door and a route. On many houses the existing landing does not reach where the extension lands, so either the stair is reconfigured, a room is passed through, or a section of the first floor is replanned. A bedroom reached only through another bedroom is poor design and can be a problem on resale. Escape from the first floor is a building regulations matter, and adding rooms can change what the whole floor needs.

Why a 2 storey rear extension meets objections more often

A two storey rear addition is visible from neighbouring gardens and windows in a way that a single storey one is not. Loss of light, overlooking and the effect on the neighbouring outlook are the objections that actually carry weight. Councils often apply a rule of thumb about how far a two storey element may project beyond a shared boundary. Designing to that from the start converts a contested application into a straightforward one.

Structure and the party wall

Two storeys put real load into new foundations and into any opening cut through the existing wall, so a structural engineer is not optional. Excavation within the statutory distances of a neighbour's foundations, or work on the wall itself, engages the Party Wall etc. Act, and notices have their own timetable. Build the notice periods into the programme rather than discovering them the week the digger arrives.

Questions people ask about double storey rear extension

Are two storey extensions permitted development?

Sometimes, within tighter limits than a single storey one, particularly on depth beyond the rear wall and distance to the boundary. Check the technical guidance against your own property.

Do I have to reconfigure the stairs?

Only if the landing cannot reach the new rooms. It is the question to answer on the first plan, because it can change whether the project is worth doing.

How long do party wall notices take?

The Act sets response periods, and a neighbour who dissents means surveyors and an award. Allow for it in the programme from the outset.

Will the roof have to be altered?

Usually the new roof ties into the existing one, and how that junction is formed affects both the appearance and the cost. It is worth resolving at design stage.

Sources

Get a roofing quote from contractors registered to sign off their own work

Free for property owners. Your details go to contractors covering your area, not to a call list. We may email you about this enquiry and similar services from this site; opt out any time, including from the first message.

Related answers

Get roofing quotesSearch the register